Buying
Buying a new-construction home in Scottsdale or Phoenix: your agent, the builder’s contract, inspections and warranties
The short answer
When you buy a new home from a builder, the sales agent in the model home works for the builder, so if you want your own agent, bring them from your first visit and ask the builder for its registration policy in writing.
You sign the builder’s own contract, and in a subdivision the builder must give you the Arizona Department of Real Estate’s public report before you sign any offer. Read the report’s figures for HOA fees and special districts, check the builder’s license with the Registrar of Contractors, and plan your own inspections before the drywall goes up and at the final walk-through.
The builder’s sales agent works for the builder
The sales agent in a builder’s model home or design center works for the builder. Arizona’s rules say a licensee “owes a fiduciary duty to the client” and must protect and promote the client’s interests (A.A.C. R4-28-1101(A)), and a builder’s sales agent’s client is the builder. They can tell you a lot about the floor plans, lots and options, but getting you the best terms isn’t their job.
If you want someone on your side for the price, the terms, the contract’s deadlines and the walk-through, that’s your own buyer’s agent, working under a written buyer agreement. How buying a home works in Arizona explains that agreement. Compensation is negotiable and isn’t set by law. Your agreement says what your agent is paid and how, including whether any of it may come from the builder.
Register your agent before or at the first visit
Builders set their own policies for working with a buyer’s agent. Some ask that your agent come with you to your first visit, or register you with the builder before you arrive, and may decline to work with an agent you bring in after you’ve signed in on your own. The policy is the builder’s, so ask each one.
So before you walk into a model home or fill in a guest card:
- Ask the builder for its agent registration policy in writing.
- If you already have an agent, bring them, or have them register you as the policy says.
- Keep a copy of the registration or the email that confirms it.
The builder’s contract is its own document
Most resale homes in Arizona are bought on the Arizona REALTORS® Residential Resale Real Estate Purchase Contract. A builder sells on the contract it gives you, and its terms are whatever it says. Don’t assume it has the resale contract’s inspection period, notices or remedies. Read it for:
- The deposit and option payments: how much, who holds them, and when they stop being refundable.
- The completion date: whether it’s an estimate, and what happens if the home is late.
- Inspections: whether your own inspector may come in during construction and before closing, and when.
- Changes: whether the builder may substitute materials or change the plan, and what notice you get.
- Disputes: whether claims go to arbitration, and what the warranty says about how to make a claim.
- The price: every lot premium, upgrade and credit you agreed to, written into the contract or a signed addendum.
Have a real estate attorney read it before you sign, and ask the builder for the warranty document at the same time.
The public report: read it before you sign anything
A subdivider, which the Buyer Advisory describes as anyone who offers six or more lots in a subdivision for sale or lease, must give each first buyer a copy of the Arizona Department of Real Estate’s public report before the buyer signs any offer to purchase, and take a receipt for it (A.R.S. § 32-2183(A)). Unless the sale is exempt, a sale made before the report was issued, or without delivering it, can be rescinded by the buyer, in an action brought within three years after the buyer signed the agreement (the same section).
Among other things, the report must state:
- any debt that a special district, taxing area or assessment district has incurred, or plans to, to pay for improvements or community facilities, and that will be paid through a tax or assessment on the subdivision (A.R.S. § 32-2181(A)(14));
- the approximate annual taxes, special assessments or fees the buyer will pay to maintain the common facilities (A.R.S. § 32-2181(A)(15)).
The Department doesn’t verify what’s in a report, so the Buyer Advisory says to check anything important yourself. Reports from January 1, 1997 on are in the Department’s public report database, so you can read a community’s report before you visit.
HOA fees, community facilities districts and the CAGRD
A new home can carry charges on its tax bill as well as the HOA’s.
- Community facilities districts (CFDs) are special taxing districts that issue bonds to build and run public infrastructure such as roads, sewers, utility lines and parks. The Buyer Advisory suggests asking how much is still owed and how many payments are left, and checking the property’s detailed tax statement, which shows the current amount due to the CFD.
- The CAGRD. Where a subdivision is a member of the Central Arizona Groundwater Replenishment District, homeowners pay an annual assessment through the county property tax, based on the groundwater delivered to member homes.
- The HOA. Read the declaration (CC&Rs), the budget and the fees, and compare the public report’s estimate with what the association charges today.
Arizona property tax basics explains the rest of the bill.
Lot premiums, upgrades and square footage
A builder’s price list may add a premium for a particular lot, and design-center options add to the base price. Before you sign:
- Ask which features in the model home are standard and which are options.
- Get the total, with every premium and option, into the contract or a signed addendum.
- Ask when option payments are due, and whether they’re refundable if the sale falls through.
- If square footage matters to you, the Buyer Advisory suggests having an appraiser or architect confirm it before you sign the contract on a new home.
On a North Scottsdale lot, also read what the lot’s natural area open space means for where you can build, fence and landscape.
Inspections: before the drywall and at the walk-through
The city inspects a new home in stages for its building permit. In Scottsdale, for example, the framing inspection comes when the walls are framed and the electrical, plumbing and mechanical work is roughed in, “but before any of this work is covered”, and the insulation inspection comes before the drywall goes up. Those inspections are the city’s, for the permit.
Your own inspector works for you. If the builder’s contract allows it, two visits are worth planning:
- Before drywall: at the same stage as the city’s framing inspection, while the framing, wiring, plumbing and ductwork are still visible.
- Before the final walk-through: a full inspection of the finished home, so the list you give the builder at the walk-through is complete.
Arizona certifies home inspectors (A.R.S. § 32-122.02), so ask for the inspector’s certificate number. Check the builder’s or contractor’s license with the Registrar of Contractors too. The Buyer Advisory notes that an owner acting as a developer who hires a licensed general contractor must name the licensed contractors and their license numbers in all sales documents.
The builder’s warranty and the Registrar of Contractors
The builder’s written warranty says what’s covered, for how long and how to make a claim, so read it with the contract and keep it with your closing papers.
If something goes wrong, you have two separate routes:
- A complaint with the Arizona Registrar of Contractors (ROC). For new construction, a complaint against a licensed contractor must be filed within two years after the close of escrow or actual occupancy, whichever came first (A.R.S. § 32-1162; the ROC’s complaint page says the same). Before the ROC cites a contractor for workmanship, the contractor must have had a chance to inspect the work within 15 days after the ROC’s written notice (A.R.S. § 32-1155(D)).
- A claim against the seller for construction defects. Before filing a dwelling action, Arizona law requires the buyer to send the seller written notice by certified mail describing the defects. The seller may inspect, and must send a good-faith written response within 60 days, which may offer to repair, replace or pay (A.R.S. § 12-1363).
Deadlines and the right route depend on your contract and your facts, so talk to a real estate attorney before you choose one.
How long it takes
In the Census Bureau’s Survey of Construction, single-family homes completed in 2025 in its West region, which includes Arizona, took these average times:
| Built how | Permit to start | Start to completion |
|---|---|---|
| Built for sale by a builder | 1.3 months | 6.4 months |
| Built by a contractor for the owner (on the owner’s lot) | 1.5 months | 14.0 months |
These are regional averages from a national survey, not a promise for any home. Your own timeline is the one in your contract, including what it says about delays. If you’re financing, ask your lender how long a rate lock lasts and what extending it costs.
Before you sign with a builder
- Ask the builder for its agent registration policy in writing, before your first visit.
- Read the public report, and look up the community’s CFD and CAGRD charges.
- Have a real estate attorney read the builder’s contract and warranty.
- Get every price, premium and option into the contract.
- Plan your inspections before drywall and before the final walk-through.
Compare where the new communities are on the area pages, or talk to Aaron about a home you’re considering.
Key takeaways
- The sales agent in a builder’s model home works for the builder, not for you.
- Ask the builder for its agent registration policy in writing before your first visit.
- In a subdivision, you get the public report before you sign any offer, so read it first.
- Check the public report and the tax statement for CFD, CAGRD and HOA charges.
- If the contract allows it, have your own inspector in before the drywall and before the final walk-through.
Questions people ask next
Can you use your own agent to buy a new build?
Yes, under the builder’s policy for working with buyers’ agents. Ask for it in writing before your first visit, since some builders ask that your agent come with you or register you before you arrive. Register your agent
Do you need an inspection on a brand-new home?
The city’s inspections are for the building permit, and your own inspector works for you. If the builder’s contract allows it, plan one visit before the drywall goes up and one before the final walk-through. Inspections
What is a community facilities district?
A special taxing district that issues bonds to build and run public infrastructure such as roads, sewers and parks. Its charge shows on the property’s detailed tax statement, and a subdivision’s public report must state the district’s debt. CFDs and the CAGRD
How long do you have to file an ROC complaint about a new home?
For new construction, two years after the close of escrow or actual occupancy, whichever came first (A.R.S. § 32-1162). Warranty and the ROC
How long does it take to build a new home?
In the Census Bureau’s West region, homes built for sale and completed in 2025 took 6.4 months on average from the start of construction, and contractor-built homes on the owner’s lot took 14.0 months. Your contract’s date is the one that counts. How long it takes
About this guide
General information, not legal, tax or financial advice. Your own contract controls, and your attorney, tax professional or other advisers can confirm what applies to you.
This describes how buying from a builder usually works, and it isn’t legal advice. The builder’s contract controls, so have a real estate attorney read it before you sign.
Sources checked November 18, 2026. Rules and figures can change.
Sources
- A.A.C. R4-28-1101, licensee duties, in the Arizona Real Estate Law Book (2026 edition), accessed November 18, 2026azre.gov
- National Association of REALTORS®, settlement FAQs (written buyer agreements; compensation not set by law and fully negotiable), accessed November 18, 2026nar.realtor
- Arizona REALTORS®, publisher of the Residential Resale Real Estate Purchase Contract, accessed November 18, 2026aaronline.com
- A.R.S. § 32-2183, subdivision public reports, accessed November 18, 2026azleg.gov
- A.R.S. § 32-2181, what a subdivision public report must contain, accessed November 18, 2026azleg.gov
- Arizona Department of Real Estate and Arizona REALTORS®, Buyer Advisory (January 2025 edition): the public report, community facilities districts, CAGRD, square footage and licensed contractors, accessed November 18, 2026azre.gov
- Arizona Department of Real Estate, public report database (Search Developments), accessed November 18, 2026services.azre.gov
- City of Scottsdale, Inspection Services: building inspections in order (updated May 21, 2026), accessed November 18, 2026scottsdaleaz.gov
- A.R.S. § 32-122.02, certification of home inspectors, accessed November 18, 2026azleg.gov
- Arizona Registrar of Contractors, File a Formal Complaint (the Internet Archive’s copy of October 31, 2026, as the live page refuses automated tools), accessed November 18, 2026web.archive.org
- A.R.S. § 32-1162, when a complaint against a contractor must be filed, accessed November 18, 2026azleg.gov
- A.R.S. § 32-1155, complaints against contractors and the contractor’s chance to inspect, accessed November 18, 2026azleg.gov
- A.R.S. § 12-1363, notice and repair before a purchaser dwelling action, accessed November 18, 2026azleg.gov
- U.S. Census Bureau, Survey of Construction: average length of time from authorization to start and from start to completion, by region (2025), accessed November 18, 2026census.gov
Areas in this guide
- Read about North ScottsdaleHigh-desert golf and master-planned communities
- Read about Paradise ValleySeparate town with large lots and mountain views
- Read about Fountain HillsA separate town east of the McDowell Mountains
- Read about Cave Creek and CarefreeTwo desert foothill towns, many on large lots
- Read about Rio VerdeUnincorporated communities near the Verde River